A group wearing lanyards walking through a bright airport concourse lined with shops and indoor trees, an InJourney sign on the wall behind — 2025

VM Guidelines — the brand guideline, the seasonal guideline and the planogram.

A written visual standard for locations nobody can visit every week — starting from how each one looks today.

9+ years of operation15 cities across Indonesia100+ brands1000+ projects

03/

What this covers

The brand guideline, the seasonal guideline and the planogram — each shown with the work on record behind it, or a plain note where there is none yet.

  1. 01 /

    VM Brand Guideline

    The VM Guideline and the VM Planogram produced first, then the product display set according to them.

    Ria MirandaAl Kahf Space · 2020

    Counted under Design in the archive

  2. 02 /

    Seasonal VM Guideline

    Not yet posted as a project of its own.

    A guideline for the campaign calendar, so each season’s look reaches every store the same way.

    Draft — to be confirmed by VMID

  3. 03 /

    VM Planogram

    A detailed planogram drawn before the store is filled — for over 150 product displays, then handed over for the setup.

    CorkciclePlaza Senayan, Jakarta · 2025LUAR LivingIDD PIK, Jakarta · 2024

    Both counted under VM Display in the archive

04/

What lands in your hands

Every line below is a document your locations can follow, or the session that hands it over.

  1. 01Site analysis of current conditions across the locations visited
  2. 02The VM brand guideline document
  3. 03A seasonal guideline for the campaign calendar
  4. 04A planogram per store
  5. 05A handover briefing for the people who apply it

The planogram line leans on two store openings counted under VM Display, not on a guideline job: Corkcicle, Plaza Senayan, Jakarta and LUAR Living, IDD PIK, Jakarta.

Draft — to be confirmed by VMID

05/

How a job runs — and what we need from you

Six steps, and every one of them waits on something only you can hand over. Here is what, and when.

  1. 01

    Brief

    You receive — A written read-back of the brief, so you can correct it before anyone draws

    We need from you — The campaign or theme, the product series it supports, the store list, the target date, and your existing VM guideline if you have one

  2. 02

    Site check

    You receive — Measurements and photographs of every window or floor in scope

    We need from you — Store access, a named contact per store, and the building’s working hours

  3. 03

    Concept & design

    You receive — Named concept directions with materials, finishes and lighting

    We need from you — One decision-maker, and feedback inside an agreed window

  4. 04

    Mock-up & approval

    You receive — A mock-up of the display as it will be installed

    We need from you — Written approval — and product samples if the display holds product

  5. 05

    Drafting

    You receive — The guideline drafted from what the site checks found

    We need from you — One decision-maker to review the draft, and any brand rules it has to sit inside

  6. 06

    Handover briefing

    You receive — A briefing that walks the people who apply the guideline through it

    We need from you — The store or site teams who will use it, together in one session

Draft process — to be confirmed by VMID

  • Gloved hands arranging a set of cream jewellery riser blocks on a white plinth
    A riser sample checked by hand, CMK Group Gold Collection, 2022
  • A team member taping a cardboard box shut, finished riser pieces laid out beside it
    Risers boxed for delivery to the stores, CMK Group Gold Collection, 2022
  • Two installers on either side of one stepladder, hanging a garland above a restaurant window
    Christmas decoration installed on site, Arena Corp., 2022
06/

The engagement filed under VM Guidelines

One engagement is filed under VM Guidelines & Consulting — InJourney Airports, still running when VMID posted it.

What was asked

Help develop and implement a VM guideline tailored for all airports under InJourney’s management.

What came first

Intermediate and Advanced VM training sessions, completed before the guideline work — part of the same consulting engagement.

That is VM Trainings
Under way when posted

On-site visits to domestic and international airports — current conditions analysed and the key VM challenges identified, so the recommendations stay practical and scalable.

On record

InJourney Airports · in progress when posted · 2025

  • A group standing beneath hanging airport direction signs in front of a liquor and tobacco shop, one pointing up and one taking a photograph
    Under the direction signs in a terminal concourse, InJourney Airports, 2025
  • A group walking past a blue WHSmith shopfront in an airport terminal, some holding papers
    Walking past a WHSmith shop in the terminal, InJourney Airports, 2025
  • People seated at a long table with laptops open, looking toward the front of the room
    Around a table, laptops open, InJourney Airports, 2025
07/

How far one guideline reaches

One row, because one engagement is filed under this service — a guideline being developed for every airport InJourney manages.

  1. Every airportInJourney Airports, 2025A VM guideline being developed for all airports under InJourney’s management — with on-site visits to domestic and international airports.
08/

What this service does not cover

Three things this service does not cover — named here, so none of them turns up as a surprise in the brief.

  • Carrying out the guideline store by storeThat is VM Display
  • Printing and distributing the document
  • Software to enforce it

Draft — to be confirmed by VMID

09/

Not sure this is the one?

If your stores already look right and only drift back a few weeks after every campaign, this is the wrong page — you want the retainer.

  • “The opening date is set and the fixtures are already ordered.”

    VM Display — New Store Set-up
  • “Your window is fine, but a few weeks after every campaign the floor drifts back.”

    Retainer
  • “Your stores look different from each other and nobody can say which one is correct.”

    VM Guidelines
  • “Your team turns over, and display quality drops with it.”

    VM Trainings
10/

Before the first call

Lead time, your own build vendor, your head office’s guideline, cities outside Jakarta — four answers taken from the archive instead of from a promise.

How far ahead should we brief you before a campaign date?

Work back from your installation date, and read three documented jobs rather than a promise. Ten Passion Jewelry stores from design to installation in three weeks, across Jakarta, Cirebon and Manado. A jewellery riser for 77 stores — sample making, production and the delivery timeline, in two weeks. Forty-four Frank & Co Christmas windows produced, grouped and logged for shipment in ten days.

Draft answer — to be confirmed by VMID

Will you work alongside our own store-build or interior vendor?

Yes. At Looklab, Lippo Mall Puri, the store design came from Paragon’s in-house store design team and the build from a separate contractor, while VMID handled the props, the VM points and the installation.

Draft answer — to be confirmed by VMID

Our head office already has a VM guideline. Can you work inside it?

Yes. The Frank & Co window runs started from a brief written by their own head-office VM team, and the Lumine Jakarta jobs from briefs sent by their Singapore HQ.

Draft answer — to be confirmed by VMID

Do you work outside Jakarta?

Yes. The archive records dated work in each of these places, and every name opens the projects filed there:

Draft answer — to be confirmed by VMID

What does the guideline actually arrive as, and who uses it day to day?

The engagement filed under this service is InJourney Airports, still running when VMID posted it in 2025: on-site visits to domestic and international airports and an analysis of current conditions are part of developing the guideline.

The form of the finished document, and who uses it day to day, are not described in any post. To be answered by VMID.

Draft answer — to be confirmed by VMID

11/ Start a project

Send the number of locations first.

How many locations the guideline has to cover, and where they are, shape every step on this page — start the brief with those two lines.

Some of what the brief asks

  • brand & retail category
  • city
  • type of work
  • number of stores
  • when it has to be live
Start a project

You will hear back within [PLACEHOLDER — response time never published].

Prefer WhatsApp? [PLACEHOLDER — VMID publishes no phone number]

Nine questions.
Three minutes.

Start a project