Masshiro&Co. store on a VM retainer — black and white garments on rails around a low wooden display table

Five services. Pick the one that matches what you already have.

Design · Build · VM Display · VM Trainings · VM Guidelines — the five services VMID® names as its own, each with the work behind it.

9+ years of operation15 cities across Indonesia100+ brands1000+ projects

02/

What we do

Five service lines, and the archive work behind every one of them — the thinnest included.

The three names under each service are VMID’s own. The numbers open the work filed under it.

03/

Which one, in one table

The difference between the five is what you already have when you arrive.

  • Design

    You come with
    a space, no drawing
    You leave with
    store, window and props drawn
    What stays behind
    the drawings, until it is built
  • Build

    You come with
    a drawing, no maker
    You leave with
    the thing built and installed
    What stays behind
    the fixture, in the store
  • VM Display

    You come with
    a finished store, a wrong display
    You leave with
    store dressed, product placed, window live
    What stays behind
    the display, until the next changeover
  • VM Trainings

    You come with
    a team that resets it wrong
    You leave with
    a store team that can do it
    What stays behind
    the skill, with the people
  • VM Guidelines

    You come with
    more stores than you can visit
    You leave with
    a written standard your stores follow
    What stays behind
    the standard, until the brand changes

Each of the five has one piece of work further down this page you can open and look through.

04/

Not sure which one?

Three situations this archive keeps coming back to. Find the one that sounds like your week.

  1. “The opening date is set and the store is still empty.”

    Start with VM Display — New Store Set-up

    What VM Display includes
  2. “The window has to change for Ramadan, then Christmas, then Chinese New Year.”

    Start with VM Display — window displays

    What VM Display includes
  3. “We set it up beautifully, and two weeks later the staff has undone it.”

    Start with VM Trainings, then VM Guidelines

    What VM Trainings includes
05/

When you need two of them

Some stores in this archive were designed and built in the same job — the layout drawn, then the floor fitted out to it.

06/

One you can open, for each

Four of the five open into a full project page. The fifth opens into a single archive entry, because a single entry is all there is.

08/

One-off, or ongoing

Some brands in this archive came back for job after job. Only a few of those jobs were ever filed as a retainer.

VMID’s own menu lists VM Retainer Basis under VM Display, and explains it nowhere. It has a page of its own here.

09/ Start a project

Name the one you think fits.

Every one of the five has work behind it you can open — including the thinnest. The brief takes the service you think you need, and the store you have.

Some of what the brief asks

  • brand & retail category
  • city
  • type of work
  • number of stores
  • when it has to be live
Start a project

You will hear back within [PLACEHOLDER — response time never published].

Prefer WhatsApp? [PLACEHOLDER — VMID publishes no phone number]

Nine questions.
Three minutes.

Start a project